Does your contractor need to be lead-safe certified?
Short answer
If your home was built before 1978 and the job will disturb painted surfaces, yes. EPA's Renovation, Repair and Painting Rule requires that anyone paid to do that work be certified and their employees trained in lead-safe practices. You can search for certified firms in EPA's online locator, and you should ask to see the certification before sanding or demolition starts.
Why 1978
In 1978 the federal government banned the sale of lead-based paint for use in homes. EPA says approximately three-quarters of the homes in the United States built before 1978 still contain some lead-based paint.
Intact, the paint is mostly a dormant problem. Renovation wakes it up. EPA notes that common activities such as sanding, cutting and replacing windows can create lead dust and chips, and that any renovation, repair or painting project in a pre-1978 home with lead-based paint can easily create dangerous lead dust. The dust is the hazard, especially for young children.
What the rule requires
EPA's Renovation, Repair and Painting Rule, known as the RRP Rule, requires that anyone paid to perform work that disturbs painted surfaces in homes, childcare facilities and preschools built before 1978 be certified, and that their employees be trained in lead-safe work practices.
Two things follow for a homeowner.
It is a contractor obligation. The rule applies to people paid to do the work. It is a separate credential from a state contractor license, and a contractor can hold one without the other.
It applies to ordinary jobs. Window replacement, kitchen and bath demolition, exterior paint preparation, cutting into old plaster walls. If painted surfaces from before 1978 are being disturbed, it is the sort of job the rule was written for.
How to check
- Find out when your house was built. Your county assessor's record or closing documents will say.
- Ask the contractor whether the firm is lead-safe certified. EPA advises homeowners to hire a contractor certified and trained in lead-safe work practices and to look for the Lead-Safe Certified Firm logo.
- Search EPA's certified firm locator. It lists EPA and state certified renovation firms by area.
- Ask who on the crew is the trained renovator and whether that person will be on site.
- Read EPA's Renovate Right guide, which explains why to hire a lead-safe renovator and what to expect.
What lead-safe work looks like
You do not have to supervise, but you should recognize the difference between a crew that takes it seriously and one that does not. EPA describes lead-safe work practices as a group of techniques to prevent lead exposure during these projects. In plain terms, expect the work area to be contained, dust to be kept down and cleaned up carefully, and the household kept out of the work area until that cleanup is done.
Ask before the job:
- how the work area will be sealed off from the rest of the house
- what happens to dust and debris at the end of each day
- how they clean and check the area when the work is finished
- where children and pets should be while paint is being disturbed
A contractor who answers these quickly has done it before. One who says "we just sweep up" has told you they have not.
After a disaster
EPA notes that the RRP Rule includes an emergency provision that exempts firms from certain requirements, so that owners and occupants can act quickly to preserve their homes after disasters. That provision is about speed in an emergency. It is not a general permission for storm repair crews to ignore lead for months afterward, so ask what practices the crew is following.
How this fits with the other checks
Think of it as one more line on the verification list for an older home:
| Check | Who issues it | Where to verify |
|---|---|---|
| Contractor license or registration | Your state or locality | State lookup pages |
| Insurance | The contractor's insurer | The agent, directly |
| Lead-safe firm certification | EPA or an authorized state | EPA's firm locator |
Doing your own work is different. The rule is aimed at paid renovators, and EPA publishes separate guidance on lead-safe renovations for do-it-yourselfers. The dust is equally dangerous whoever makes it.
If there are young children or a pregnant person in the house, treat this check as non-negotiable for any job that disturbs old paint, however small.
My house was built in 1985. Does this apply?
The rule covers homes built before 1978. A 1985 house is outside it.
The contractor says testing showed no lead paint. What then?
Ask for the test result in writing and who performed it. The requirements turn on lead-based paint being disturbed, so a documented negative result for the surfaces involved changes the picture. A verbal assurance does not.
Does my state run this program instead of EPA?
Some states are authorized to run their own renovation programs, which is why EPA's locator covers both EPA and state certified firms. The locator is the place to start either way.
Sources
- EPA: Lead Renovation, Repair and Painting Program
- EPA: Renovation, Repair and Painting Program, information for consumers
- EPA: Lead-safe certified firm locator
Sources last checked: November 2026. Written by the Before You Hire a Pro editorial desk. Report an error.