Before work starts on day one: checklist

The contract is signed and the start date is set. These are the things to settle in the last week, while everyone is still on good terms and nothing has been demolished.

Prints on plain paper with empty boxes to tick.

Paper

  • I have a fully signed copy of the contract, with every page and attachment.
  • The cancellation period, if one applied, has passed, and I am content to proceed.
  • The permit has been issued in the contractor's name, and I have seen it.
  • I know which inspections are required and at what stages.
  • I called the insurance agent this week; liability and workers' compensation are in force.
  • I re-checked the license or registration status this week.
  • I have the list of subcontractors and main suppliers.
  • I have told my own homeowner's insurer about the project, if it is a large one.

Money

  • The deposit has been paid by check or card to the business name, and I have a receipt.
  • I know which milestone triggers the next payment and what "complete" means for it.
  • I have blank lien waiver forms ready, or the contractor has shown me theirs.
  • In New York: I know which bank holds my deposit in escrow, or I have the bond.
  • In Texas, for a homestead job over $5,000: I have written verification of the construction account.

The house

  • I photographed and videoed every room, the driveway, the yard and neighboring fences as they are now.
  • Valuables, fragile items and anything in the work area have been moved.
  • Floors and furniture near the work area will be protected, and we agreed by whom.
  • I know where materials and the dumpster will go.
  • If the house is pre-1978 and paint will be disturbed: we discussed containment and cleanup, and where children and pets will be.

Rules for the site

  • Working hours and days.
  • Which entrance, which bathroom, where to park.
  • Smoking, music and pets.
  • How the house is secured at the end of each day, and who has keys or codes.
  • End-of-day cleanup standard.

Communication

  • One named person at the contractor's firm is my contact, with a mobile number.
  • We agreed a regular time to walk the job, such as once a week.
  • Changes will be priced in writing before they are done.
  • Neighbors have been told about noise and deliveries.

Why bother before day one

Most of what goes wrong on a job was visible beforehand. The Indiana Attorney General advises that a contractor should not start work until the permit is issued. California's license board suggests that the contract carry instructions about pets, children and areas where materials may not be stored. Massachusetts notes the permit card must be posted at the job site. Photographs taken now settle arguments later about whether the crack in the driveway was already there.

The contractor wants to start before the permit comes through. Is a day or two a problem?

It can be. Work done before the permit is issued is unpermitted work until it is, and anything covered up may have to be exposed for the inspector. Wait for the permit.