before you hire a pro

Checking

How to check a contractor's license

Short answer

Ask for the license number, find the state agency that issued it, and search the agency's own lookup by number. Then read the entire record: status, the name it is issued to, the category of work, the bond and insurance fields, and any discipline. A license number printed on a truck proves only that someone can print.

Before you search: which office?

There is no national contractor license. Each state decides whether to license contractors, which ones, and through which office, and the answers vary more than you would guess.

PatternExamplesWhere the record is
One state board licenses most contractorsCalifornia (CSLB), Arizona (Registrar of Contractors), Maryland (MHIC)State board lookup
State license only above a dollar valueNorth Carolina ($40,000), Virginia (classes by project value)State board lookup
State registration instead of a licensePennsylvania, New Jersey, WashingtonState registration search
No statewide general contractor credentialTexas, New York, Ohio, Illinois, Indiana, MissouriCity or county office; state boards for certain trades

Our state pages give the regulator, the lookup link and the complaint route for each state we have checked.

The method

  1. Get the number in writing. Ask for it by text or email so there is no mishearing. In California it must appear on business cards, bids, contracts and advertisements. Pennsylvania and New Jersey require the registration number on contracts and advertising.
  2. Go to the regulator's site yourself. Type the address or use a link from the state's own pages. Do not follow a link the contractor sends you to "their license page".
  3. Search by number first. Then search by business name and compare. Names can be nearly identical; numbers are not.
  4. Check the status. You want current and active. Expired, suspended, inactive and revoked all mean the same thing for your purposes: not today.
  5. Check who it is issued to. The California board advises asking for a pocket license and photo ID and making sure "the person you're dealing with is the same person on the license". For a company, the business name on the record should match the name on the contract.
  6. Check the category. A license is for a kind of work. Michigan's Maintenance and Alteration license lists specific trades. Virginia's has a class that caps project value. Florida's may be valid only in certain local jurisdictions.
  7. Read the financial fields. Bond, liability insurance and workers' compensation appear on many records. Washington's Verify tool shows whether a contractor is bonded and insured. California's shows workers' compensation information.
  8. Read the history. Complaints, citations, disciplinary actions and lawsuits against the bond, where the state publishes them.
  9. Save a copy. Print the record or save it as a PDF with the date. If things go wrong you will want to show what the record said when you hired.

What "active" does not tell you

The CSLB puts it neatly: "Seeing a license number doesn't necessarily mean the license is valid", and by extension a valid license does not mean a good contractor. It means the business met the entry requirements and has not been removed.

What the entry requirements are differs by state, and it is worth knowing which kind you are looking at.

  • In Washington, general contractor registration is financial: a bond, liability insurance, an application and a fee.
  • In Massachusetts, the Home Improvement Contractor registration involves no examination; the Construction Supervisor License does.
  • In Ohio, the state Master License comes after an examination, but the state board regulates commercial work and leaves houses to local government.
  • In Arizona, a license means a bond exists, yet the Registrar does not require liability insurance for licensing.

So the same word, "licensed", can mean passed an exam, posted a bond, or paid a fee. Registration versus license explains how to tell.

Borrowed and mismatched licenses

The most common trick is not a fake number. It is a real number that belongs to someone else: a former employer, a relative, a company with a similar name. Three checks catch nearly all of it.

  • The name on the license matches the name on the contract and on the check you write.
  • The address or city on the record makes sense for a contractor working in your area.
  • The person signing your contract appears on the record as an owner, officer or qualifier, or can show they are employed by the license holder. In California, salespeople need their own Home Improvement Salesperson registration, and Maryland licenses salespersons separately too.
Warning

If the contractor asks you to make the check out to an individual, or to a different business name from the one on the license, stop and ask why before paying anything.

Where there is no license to check

In Texas, the Department of Licensing and Regulation's program list covers electricians and air conditioning contractors but has no general contractor program. In Ohio the state board says residential contractor regulation is local. In Indiana, the Attorney General says requirements vary from community to community.

There, the sequence becomes: local building department first, state trade boards for the electrician and plumber, and then the checks no state can do for you. See states without a general contractor license.

Subcontractors

You hired one company. Five may work on your house. The CSLB's advice for avoiding liens is to make sure your contractor hires only licensed subcontractors, and to check their licenses too. Ask for the list before work starts. Massachusetts likewise suggests checking the registration status and history of the contractor or subcontractor.

How long does a license check take?

A few minutes per contractor when you have the number. Most of the time goes on reading the record properly, which is the part people skip.

The record shows a complaint. Is that disqualifying?

Not automatically. Read what it was, how old it is and how it ended. A pattern of similar complaints matters more than a single one on a contractor with a long record.

Can I just call?

Often, yes. California's board answers license questions at (800) 321-CSLB, Pennsylvania's registration line is 1-888-520-6680, and most boards publish a number. The online record has the advantage that you can save it.

Sources

Sources last checked: November 2026. Written by the Before You Hire a Pro editorial desk. Report an error.