How do you avoid storm chaser contractors after a disaster?
Short answer
Call your insurer before you talk to any contractor, make the house safe with temporary repairs, and take your time over the permanent ones. Do not sign over your insurance check, do not pay in full up front, and check the license in the state where you live, since after a disaster the FTC warns of contractors who say they do not need one.
Why disasters attract them
The Missouri Attorney General's office calls construction fraud the most common type of fraud that follows a disaster. The conditions are ideal for it. Thousands of households need the same repair in the same week. Local contractors are booked. Insurance money is on the way. And homeowners are tired, displaced and anxious to see something happen.
The Texas Attorney General describes the scene: after a natural emergency, door-to-door contractors flock to some neighborhoods offering clean up and repair services, and while many are honest and reputable, some are not.
"Storm chaser" covers a range. Some are outright thieves who take deposits and leave. Many are real crews from elsewhere who do fast, mediocre work and are gone when the leaks start. For you the second kind is the more common problem.
First, the insurer
- Call your insurance company before any contractor. The Texas Attorney General advises having your adjuster estimate the damage and probable repair cost, which gives you a professional benchmark when you negotiate.
- Confirm your coverage yourself. The FTC says to verify your insurance coverage directly, not through a contractor.
- Photograph everything before anything is moved or covered.
- Make temporary repairs to prevent more damage, such as tarping, boarding and shutting off water, and keep the receipts.
Anyone who offers to "handle the insurance for you" deserves care. Missouri's insurance department draws the line clearly: a public adjuster is a licensed insurance professional you hire to evaluate your policy, document damage and negotiate with the insurer. A contractor estimates and performs the repairs. A person claiming to be both at your front door should prompt questions about what license they hold for the first role.
Signs specific to disasters
The FTC's list for weather emergencies includes contractors who:
- say they do not need a license
- offer a discount if you sign right away
- ask you to sign over your insurance check, or to sign a blank contract
- demand full payment up front
- want payment by wire transfer, gift card, payment app, cryptocurrency or cash
- say they can get you FEMA relief for a fee
On the last point the FTC is categorical: FEMA does not charge application fees.
Indiana's Attorney General adds the two classic scripts, the crew that just finished your neighbor's roof and has material left, and the price that expires tonight.
The rules that help you
The three-day right. A contract signed at your home generally carries a three-business-day right to cancel. The Texas Attorney General notes that a notice of cancellation must be included if the transaction occurs at your home. Emergency repairs are an exception under the federal rule, so the right is most useful for the permanent repair contract, not the emergency tarp.
Texas disaster remediation rule. Special laws apply in Texas when a contractor from another area is working because of damage caused by an emergency. With some exceptions, these contractors are not allowed to require payment before beginning work, or partial payments exceeding an amount proportionate to the work performed.
Illinois senior protection. People over 65 have up to 15 business days to cancel a contract made and signed at home.
Florida's license tiers. A Florida "registered" contractor may contract only in the local jurisdictions where they qualified. A crew registered three counties away is not licensed in yours. See Florida.
Price gouging laws. In Texas, charging excessive prices for necessities after the governor declares an emergency can be prosecuted under the Deceptive Trade Practices Act, and the Attorney General takes those complaints.
Lead paint. EPA's renovation rule has an emergency provision that exempts firms from certain requirements so owners can act quickly after disasters. Ask crews working on a pre-1978 house what precautions they are taking anyway.
Choosing who does the permanent repair
The Indiana Attorney General's advice fits on a card: opt for the local, well-established contractor, and talk to friends who used them.
Local matters for a simple reason. Roofs fail slowly. A flashing error shows up at the first heavy rain from the wrong direction, perhaps a year on. A contractor with an office in your county and a license to protect will come back. A crew that followed the hail north will not.
Run the ordinary checks even though you are in a hurry:
- license or registration, in your state, through the official lookup
- a certificate of insurance from the agent, with workers' compensation
- a physical address you can drive past
- two local references from before the storm
- more than one estimate; the Texas Attorney General says not to be pushed into signing right away
Our checklist for vetting a roofer after a storm puts these on one page.
Paying on an insurance job
The FTC's three rules:
- Do not sign your insurance check over to a contractor. Deposit it and pay from your own account.
- Negotiate a reasonable down payment. Some states limit what contractors can ask for up front.
- Do not make the final payment until the work is done and you are satisfied. Keep all invoices and receipts.
It also suggests asking your bank or credit union about a certificate of completion, which lets the bank pay the contractor stage by stage as work is finished.
Read anything headed "authorization", "contingency agreement" or "assignment" with great care. Some documents presented as permission to inspect the roof or talk to the insurer are contracts that commit you to using that contractor if the claim is approved. Do not sign on the day. The Texas Attorney General's rule about unread contracts and blank spaces applies with full force.
If a contractor offers to waive, absorb or rebate your insurance deductible, stop and call your insurer before agreeing to anything. An offer that depends on what the insurer is told about the price is one the insurer should hear about from you first.
Help that is real
The FTC lists two federal sources: FEMA's home repair assistance, reachable through the FEMA Helpline at 1-800-621-FEMA, and Small Business Administration disaster loans for repairing a primary residence. FEMA does not charge an application fee, and you apply to both programs yourself, not through a contractor.
If you have been taken
Report it quickly. Other households on your street are being worked by the same people this week.
- your state attorney general's consumer protection office
- your state contractor board, if the contractor was or claimed to be licensed
- the FTC at ReportFraud.ftc.gov
- local police, if money was taken and no work done
Then see how to file a complaint against a contractor.
Is it wrong to hire an out-of-town contractor after a storm?
No. Some are capable firms that travel to where the work is. Hold them to the same checks, be sure they are licensed where you live, and think about who will honor the warranty in two years.
The roofer wants me to sign so he can "meet the adjuster". Should I?
Read exactly what the document commits you to. Meeting the adjuster does not require you to promise the job to anyone.
Sources
- FTC: How to avoid scams after weather emergencies and natural disasters
- Texas Attorney General: Disaster scams
- Missouri Attorney General: Scams to avoid after disasters
- Missouri Department of Commerce and Insurance: Consumer support following severe weather
- Indiana Attorney General: Storm chaser scams brochure
- Illinois Attorney General: Avoid home repair fraud
- Florida DBPR: Construction Industry Licensing Board
- EPA: Lead Renovation, Repair and Painting Program
- FTC: Buyer's remorse, the Cooling-Off Rule
Sources last checked: November 2026. Written by the Before You Hire a Pro editorial desk. Report an error.