When should you make the final payment to a contractor?

Short answer

When the work is complete, the final inspection has passed, the punch list is done, and you hold lien waivers and warranty papers. The FTC's rule is never to make the final payment until the work is done and you are satisfied. The last check is the only thing that reliably brings a contractor back for small unfinished items.

Why the last 10 percent is different

By the end of a job the contractor has been paid for nearly everything and has another client waiting. What remains is small, fiddly and unprofitable: a cabinet door that rubs, a missing switch plate, paint touch-ups, the pile of offcuts by the garage. The final payment is what makes those worth an afternoon.

Every consumer agency says some version of the same thing.

  • FTC: never make the final payment until the work is done and you are satisfied.
  • Texas Attorney General: do not pay in full until the work is complete and you have inspected it yourself and found it satisfactory.
  • Indiana Attorney General: do not make the final payment until you know all subcontractors and suppliers have been paid.

The walk-through

Schedule it in daylight, with the contractor, when they say the job is finished.

  1. Bring the contract and change orders. Check each line of the scope against what you see.
  2. Operate everything. Every door, drawer, window, tap, switch, outlet and appliance. Run water and look underneath.
  3. Look at edges. Where materials meet: caulk lines, trim joints, tile cuts, paint against ceilings.
  4. Go outside. Grading, gutters, anything disturbed by access or deliveries.
  5. Write the list together. Each item, the room, what "done" looks like. Both of you initial it and agree a date.

That document is the punch list. It should be short on a well-run job. A long one means the contractor called "finished" early, and the answer is the same either way: the list gets done, then the money moves.

Before you write the check

  • Final inspection passed. If the job had a permit, see the sign-off. An open permit is unfinished business that stays with the house.
  • Punch list complete. Walk it again; do not take a text message for it.
  • Lien waivers. Unconditional waivers for earlier payments and final waivers from the contractor, subcontractors and major suppliers. See lien waivers explained.
  • Warranties and manuals. Written workmanship warranty, manufacturer documents, registration details.
  • Site clean. California's license board suggests the contract cover complete cleanup and removal of debris and materials. Hold them to it.
  • Leftovers. Spare tile, paint with the color formulas, attic stock of flooring.
  • Final accounting. Contract price plus signed change orders, less payments made. The number on the final invoice should be the number you calculated.

Completion certificates

Where a lender or insurer is paying, you may be asked to sign a certificate of completion that releases their final payment. Treat it exactly as you would your own last check. The Texas Attorney General's instruction is not to sign until all the work is completely finished, the site is cleaned up and you are satisfied, and it adds that a reputable contractor will not threaten or pressure you to sign if the job is not finished properly.

When a small item drags on

Sometimes one part is backordered for weeks and everything else is perfect. Holding the entire final payment over a drawer pull is not fair dealing. Agree in writing to release the balance less a sensible amount for the outstanding item, enough that completing it is clearly worth the trip.

When you and the contractor disagree

If the contractor says the job is finished and you say it is not, put your list in writing with photos and a proposed date. Pay what is not in dispute. Do not withhold more than the disputed work is worth, and do not pay the disputed part to make an uncomfortable conversation end.

A contractor who is unpaid may have lien rights, so a standoff has costs on both sides. Most are settled by a specific list and a specific sum. If yours is not, see how to file a complaint against a contractor.

Warning

Once you have paid in full, getting anyone to come back depends on goodwill and warranty terms. Check twice, pay once.

The contractor wants final payment on "substantial completion". What does that mean?

It usually means the work can be used for its purpose with only minor items left. If your contract uses the phrase, also define how much is held back for those items and until when.

How quickly should I pay once everything is done?

Promptly. Within a few days of the conditions being met. Being a reliable payer is fair, and it is remembered when you need a warranty visit.

Sources

Sources last checked: November 2026. Written by the Before You Hire a Pro editorial desk. Report an error.