What warranty should a contractor give you?
Short answer
Whatever warranty the contractor offers, get it in the contract, stating what is covered, who is responsible for it and how long it lasts. State regulators give exactly that advice. A spoken "we stand behind our work" has no terms, and a manufacturer's warranty on the materials is a different promise from the contractor's warranty on the labor.
Two warranties, two companies
Most jobs come with two separate promises, and homeowners tend to blur them.
The contractor's warranty covers workmanship: the labor, the installation, the parts of the job that depend on how well it was done. It comes from the contractor and is worth what the contractor is worth.
The manufacturer's warranty covers the product: the shingles, the water heater, the windows. It comes from a company that will outlive most contractors, and it usually has conditions about how the product was installed and registered.
California's license board tells homeowners to get any warranty offered by the contractor for labor and materials in writing, whether for work done by the contractor or manufacturer warranties.
What the paper should say
The Texas Attorney General gives the clearest checklist we have read. If the contractor provides guarantees, they should be written into the contract, clearly stating:
- What is guaranteed. Labor only, or labor and materials. Which parts of the job.
- Who is responsible for the guarantee. The dealer, the contractor or the manufacturer.
- How long the guarantee is valid.
Add three more lines of your own:
- What the remedy is. Repair, replacement or refund, and who decides.
- How to make a claim. A phone number and an address, and how quickly they will respond.
- What voids it. So you do not find out afterward.
The Indiana Attorney General makes the same point in a sentence: if a contractor guarantees labor or materials, those warranties should be in writing.
Questions to ask before signing
- How long do you warrant your labor? Is it the same for every part of the job?
- Will you register the manufacturer's warranties, or do I?
- Does the manufacturer's warranty require a certified installer, and are you one?
- If a product fails under the manufacturer's warranty, who pays for the labor to replace it?
- If I sell the house, does any of this transfer to the buyer?
The fourth question is where most disappointment lives. A product warranty that supplies a new part and no labor leaves you with a free faucet and a bill.
A long warranty from a short-lived company
A "lifetime" workmanship warranty is a promise from a business that has to exist for the promise to be kept. Weigh the length of the warranty against how long the contractor has held their license or registration, which the state record will usually show. Ten years of trading and a two-year warranty is a better bet than six months of trading and a lifetime one.
This is also where licensing helps after the job. A contractor with a license to protect has a reason to return calls. In states with complaint processes and recovery funds, defective work by a licensed contractor is the kind of problem those systems were built to hear. See how to file a complaint against a contractor.
Keep what you will need later
File together, somewhere you will find them in six years:
- the signed contract and change orders, with the warranty terms
- product names, model numbers and serial numbers
- manufacturer warranty documents and proof of registration
- dated photos of the finished work, and of anything now hidden behind walls
- the final permit sign-off
Before the last payment, ask the contractor to hand over all manufacturer paperwork. It is easy to get on the final day and hard to get a month later.
When something fails
Report it in writing as soon as you see it, with photos and the date. Refer to the warranty clause. Give a reasonable deadline for a response. A written report fixes the date you raised the problem, which matters if the warranty period is close to running out, and it starts the paper trail every later remedy depends on.
The contract says nothing about a warranty. Do I have one?
State law may imply some protections, and they vary. That is a question for a local attorney or your state consumer agency. The practical answer is to put an express warranty in the contract so you never have to argue the point.
Is a one-year workmanship warranty normal?
Terms differ by trade and contractor, and the regulator pages we rely on do not set a standard length. Compare what each bidder offers in writing, alongside price.
Sources
- California CSLB: What is a contract?
- Texas Attorney General: Disaster scams
- Indiana Attorney General: Storm chaser scams brochure
Sources last checked: November 2026. Written by the Before You Hire a Pro editorial desk. Report an error.