Before you make the final payment: checklist
Once the last check is written, your say over the job is gone. Tick these off first. If one item is outstanding, hold back an amount that matches it and release the rest.
The work
- I walked every part of the job with the contractor in daylight.
- I compared the finished work with the contract scope and each change order, line by line.
- I opened, closed, ran and switched on everything that opens, closes, runs or switches on.
- I looked under sinks and around new fixtures for leaks after running water for several minutes.
- We wrote a punch list together, and every item on it is now done.
- I walked the punch list myself after being told it was complete.
Permits and inspection
- The final inspection has passed, and I have seen the sign-off or checked with the building department.
- No permit for this job is still open.
Liens
- I hold unconditional lien waivers covering every earlier payment.
- I hold a final lien waiver from the contractor, conditional on this payment.
- I hold final waivers from each subcontractor and each major supplier, or proof they were paid.
- I checked the waivers against the list of subcontractors and suppliers, and against any preliminary notices I received.
Paperwork to receive
- The written workmanship warranty.
- Manufacturer warranties, manuals and registration details for products installed.
- Model and serial numbers, paint colors and formulas, tile and flooring product names.
- Leftover materials worth keeping.
The site
- Debris, tools, equipment and the portable toilet are gone.
- The yard, driveway and neighbors' property are as they were, or repaired.
- Keys, garage remotes and alarm codes have been returned or changed.
The money
- Contract price plus signed change orders, minus payments made, equals the final invoice.
- No charge appears that I did not approve in writing.
- I am paying by check or card to the business name on the contract.
- I will get a receipt marked paid in full.
If a lender or insurer is paying
- I have not signed a completion certificate, and will not until all of the above is done.
Why the order matters
The FTC's advice is never to make the final payment until the work is done and you are satisfied. The Indiana Attorney General adds that you should know all subcontractors and suppliers have been paid, with written proof, because they may be able to file a mechanic's lien against your home if they have not. The Texas Attorney General says not to sign a certificate of completion until the work is finished, the site is cleaned up and you are satisfied. This list is those three instructions broken into steps.
One item is backordered for a month. Do I hold everything?
Hold enough to make the return visit worthwhile and release the rest, with a short written note of what is outstanding and when it will be done.
Sources
- FTC: How to avoid a home improvement scam
- Indiana Attorney General: Storm chaser scams brochure
- Texas Attorney General: How to avoid home improvement scams
- California CSLB: Conditional and unconditional waiver and release forms
Sources last checked: November 2026. Report an error.