before you hire a pro

Checking

How to verify a contractor's insurance certificate

Short answer

Ask the contractor to have their insurance agent send a certificate of insurance directly to you, then phone the agent to confirm the policies are in force. Check two coverages: general liability and workers' compensation. A certificate handed over by the contractor is a claim; one confirmed by the agent is evidence.

Why you bother

If a worker falls off your roof and the contractor has no workers' compensation coverage, the injured worker's costs have to land somewhere. The Texas Attorney General's warning is one sentence long: "If the contractor is not insured, you could be liable for accidents on your property." New York's Attorney General says the same about injuries and property damage where the contractor lacks proper insurance.

General liability is about your property and your neighbors'. Workers' compensation is about people. A homeowner asking "are you insured?" usually means the first and should care more about the second.

The certificate

Contractors prove insurance with a one-page certificate of insurance issued by their agent or broker. California's license board tells homeowners to ask to see a copy of the Certificate of Insurance, or to ask for the name of the contractor's insurance carrier and agency in order to verify that the contractor has insurance.

That second option is the stronger one. Certificates are easy to edit and easy to keep showing after a policy has lapsed.

  1. Ask for the agent's name and number. A contractor with real coverage gives this without hesitation.
  2. Ask the agent to send the certificate to you directly, listing you as certificate holder with your job address.
  3. Read it (next section).
  4. Call the agent a few days before work starts and ask whether both policies are still in force. Policies get cancelled for non-payment, and a certificate issued in March does not know what happened in May.

Reading it

On the certificateWhat you are checking
Named insuredThe same business name as on your contract and on the license record
General liability, each-occurrence limitAt least your state's required minimum, and enough for the damage your job could do
Workers' compensationPresent, with a policy number. If absent, ask why
Policy datesCover the whole expected length of the job, with margin
Insurer namesReal insurance companies you can look up with your state insurance department
Certificate holderYou, at the job address

What states require

Requirements differ, and knowing your state's floor tells you when a certificate looks thin.

  • New Jersey: registered home improvement contractors must file proof of commercial general liability insurance of at least $500,000 per occurrence, and a copy of the certificate must be part of any contract over $500.
  • Pennsylvania: liability insurance covering personal injury of not less than $50,000 and property damage of not less than $50,000.
  • Washington: $200,000 public liability and $50,000 property damage, or $250,000 combined single limit, with the Department of Labor & Industries named as a certificate holder.
  • Georgia: $300,000 per occurrence for a Residential Basic license and $500,000 for the other categories; workers' compensation only if the business has three or more employees.
  • Wisconsin: a Dwelling Contractor needs general liability of at least $250,000 per occurrence or, instead, a $25,000 bond.
  • Arizona: apart from workers' compensation, the Registrar of Contractors does not require insurance for licensing at all.

Fifty thousand dollars of property damage coverage, the Pennsylvania minimum, would not rebuild much after a fire started by a torch. The legal minimum is a floor for the state's purposes. For your purposes, ask what the limit actually is.

Checking through the state

Some regulators show insurance on the public license record, which saves you the phone call or backs it up.

  • Washington's verification tool lets you confirm that a contractor is bonded and insured.
  • California's license record includes workers' compensation information, and the board says to read it while you are on the site.
  • Wisconsin suggests confirming the status of a surety or insurance company through the Office of the Commissioner of Insurance.

Georgia's consumer protection office suggests looking on the contractor's website and, failing that, asking the company's agent. A website statement is the weakest form of proof on this list.

The "no employees" answer

A contractor may tell you no workers' compensation policy is needed because the business has no employees. Depending on the state that can be true; Georgia, for example, requires the coverage only at three or more employees. It stops being a comfortable answer when three people you have never met arrive to do the work.

Ask plainly: who will be on my property, and whose employees are they? If the answer is subcontractors, the next question is whether each subcontractor carries their own workers' compensation. If the answer is "my guys", there should be a policy.

Warning

"Exempt" on a record and a full crew on your roof do not belong together. Ask before the first day, in writing.

Your own policy

Call your homeowner's insurance agent before a large project. Ask what your policy does if a worker is injured or the work causes damage, and whether the project itself needs to be reported. The answers vary by insurer, so get them from yours.

The contractor emailed me a PDF certificate. Is that enough?

It is a start. The CSLB's alternative, getting the carrier and agency name and verifying directly, is what turns a PDF into proof.

What does being a certificate holder give me?

It records that the certificate was issued to you for this job. Ask the agent whether you will be notified if the policy is cancelled; do not assume it.

Should I be an additional insured?

On larger projects some owners ask for it. It is a question for your own insurance agent or attorney, and it goes beyond what the state consumer pages cover.

Sources

Sources last checked: November 2026. Written by the Before You Hire a Pro editorial desk. Report an error.