License and insurance check: checklist
One page per contractor. Fill it in from the regulator's website and the insurance agent, not from what the contractor tells you, and keep it with the contract.
License or registration
- I have the number in writing from the contractor.
- I found the regulator myself (see our state pages) and did not use a link the contractor sent.
- I searched by number. Record found.
- Status is current and active today. Date checked: ____________
- Name on the record matches the name on the bid.
- Address on the record is a real location in a plausible area.
- The category, class or trade list covers my job.
- Any dollar limit on the license is above my contract total.
- I read the complaint and discipline section.
- I saved or printed the record.
If my state has no license for this contractor
- I called my city or county building department and asked what it requires.
- Local registration confirmed, or confirmed that none exists.
- The business is registered with the Secretary of State, and I noted the registered agent.
- Electrician, plumber and HVAC subcontractors hold their own trade licenses, and I checked those.
Bond
- The record shows a bond in force, where my state requires one.
- I know the bond amount and understand it is shared among all claimants.
- For a large job, I asked about a performance bond.
Insurance
- I have the insurance agent's name and phone number.
- The agent sent the certificate directly to me.
- Named insured matches the contractor's business name.
- General liability limit: $____________ per occurrence.
- Workers' compensation policy is listed. If not, the reason: ____________
- Policy dates run past my expected completion date.
- I phoned the agent and confirmed both policies are in force.
- I will call again in the week before work starts.
People
- The person signing my contract is an owner, officer or authorized employee of the licensed business.
- In California or Maryland, the salesperson's own registration or license checks out.
- I have the names of the subcontractors who will work on my house.
Older homes
- House built before 1978 and paint will be disturbed: the firm appears in EPA's lead-safe certified firm locator.
What the figures should look like
State minimums give you a floor to compare against. Washington requires registered contractors to carry $200,000 public liability and $50,000 property damage cover, or $250,000 combined, and a bond of $30,000 for general contractors or $15,000 for specialty contractors. New Jersey requires $500,000 per occurrence of commercial general liability. California requires a $25,000 contractor's bond. Arizona does not require liability insurance for licensing at all, so there the certificate is the only evidence you will get.
A certificate at the legal minimum is acceptable to the state. Whether it is enough for your project is your call, and worth a conversation with your own insurance agent on a large job.
How current does the check need to be?
Run it when you shortlist, and again in the days before you sign. Licenses lapse and policies get cancelled, and the record on the day you hire is the one that counts.
Sources
- Washington L&I: Register as a contractor
- New Jersey home improvement contractor law
- California CSLB: Bond requirements
- Arizona Registrar of Contractors: Before you hire a contractor
- EPA: Lead-safe certified firm locator
Sources last checked: November 2026. Report an error.