before you hire a pro

Checking

What does "licensed, bonded and insured" actually mean?

Short answer

They are three different things. A license is permission from the state to do a type of work. A bond is a fixed pot of money a surety will pay out if the contractor breaks certain rules. Insurance pays for damage or injury the contractor causes. None of them guarantees the job gets finished, and the phrase on an advertisement proves nothing until you verify each part.

Start with the Arizona warning

The Arizona Registrar of Contractors has a section on its consumer page headed "Licensed, Bonded and Insured?" It opens: "Just because the ad says it does NOT mean it's true!" The Registrar reports that many of its complaints about unlicensed operators come from owners who believed they had contracted with a licensed, bonded and insured contractor, but had not.

Treat the phrase as three claims to check one at a time.

Licensed

A license (or in some states a registration) is the state's permission to offer a kind of construction work. What it took to get one varies. It may involve an exam, proof of experience, a financial statement, a bond, insurance, or only a form and a fee.

What it gives you:

  • an identity the state has on file, with an address
  • a regulator who can discipline the contractor
  • in some states, access to a recovery fund if things go badly

What it does not give you is any assurance about this job. Checking is covered in how to check a contractor's license.

Bonded

"Bonded" almost always refers to a license bond: a surety bond the contractor must post as a condition of the license. A surety company promises to pay claims, up to the bond amount, if the contractor violates the licensing law. The contractor must then repay the surety.

The amounts are smaller than people expect.

StateBond attached to the license or registration
California$25,000 contractor's bond
Washington$30,000 for general contractors, $15,000 for specialty contractors
Tennessee (Home Improvement license)$10,000
Wisconsin (Dwelling Contractor)$25,000, or liability insurance instead
Arizona (residential)$4,250 to $100,000, depending on the license

Three points about license bonds:

  1. The amount is a total, not per customer. California's $25,000 bond is filed for the benefit of consumers damaged by defective construction or license law violations, and of employees owed wages. Everyone with a claim shares it.
  2. It is not job insurance. A license bond does not promise your kitchen will be completed.
  3. It can be an alternative to insurance. In Wisconsin a dwelling contractor needs a bond of at least $25,000 or a general liability policy of at least $250,000 per occurrence. One or the other.

There is a different kind of bond that does protect a specific job: a performance bond, sometimes paired with a payment bond, written for your project. Washington's Department of Labor & Industries tells homeowners to consider requesting a performance bond for larger projects. In California, a contractor with a blanket performance and payment bond on file with the board is the one exception to the down payment limit. These bonds cost the contractor money and are uncommon on small residential work. If a contractor says they are "bonded", ask which bond they mean.

Insured

Two policies matter.

General liability pays for property damage and injuries to other people caused by the contractor's work: the flooded floor below, the fence the excavator backed through. Required minimums vary. Washington asks for $200,000 public liability and $50,000 property damage, or $250,000 combined. New Jersey requires $500,000 per occurrence. Pennsylvania requires $50,000 for personal injury and $50,000 for property damage. Georgia sets $300,000 or $500,000 per occurrence depending on license category.

Workers' compensation covers the contractor's employees if they are hurt on your job. This is the policy that protects you from the nightmare case. The Texas Attorney General puts it directly: if the contractor is not insured, you could be liable for accidents on your property. Whether a small contractor must carry it depends on state law and on whether they have employees. Georgia requires it at three or more employees.

And then the surprise. In Arizona, with the exception of workers' compensation, the Registrar does not require an entity to possess insurance to be licensed. A valid Arizona license is evidence of a bond and no evidence of a liability policy.

What none of the three covers

  • Abandonment. Liability insurance does not pay because the contractor stopped showing up.
  • Poor workmanship as such. A liability policy responds to damage caused by the work. It is generally not a warranty on the work itself. Ask the contractor's agent what their policy excludes if this matters to your job.
  • Your deposit. Money paid ahead of work is protected only by the contract, a small bond you share with other claimants and, in some states, a recovery fund.

This is why every regulator's payment advice says the same thing in different words. The Arizona Registrar: do not allow payments to get ahead of the work. Being licensed, bonded and insured does not make a large deposit safe.

How to verify each claim

  1. Licensed: search the regulator's lookup by number.
  2. Bonded: read the bond field on the license record, where the state shows it. Washington's verification tool shows bond status.
  3. Insured: ask for a certificate of insurance sent to you by the insurance agent, and call the agent to confirm it is in force. See how to read a contractor's insurance certificate.
License bond amounts stated by state regulators
Washington, general$30,000California$25,000Wisconsin, dwelling$25,000Washington, specialty$15,000Tennessee, home improvement$10,000

Is a bigger bond a sign of a better contractor?

It is a sign of the state's requirement or the license class, not of quality. In Arizona the bond range runs from $4,250 to $100,000 depending on the license.

If the contractor is bonded, do I still need lien waivers?

Yes. A license bond is small and shared. Lien waivers deal with a different risk, which is suppliers and subcontractors who were not paid. See lien waivers explained.

Sources

Sources last checked: November 2026. Written by the Before You Hire a Pro editorial desk. Report an error.