before you hire a pro

License lookup by state

How to check a contractor license in Michigan

Short answer

Verify the license through the Department of Licensing and Regulatory Affairs. Michigan requires a state license for any contractor offering work that totals $600 or more in labor and materials, and the license comes in two kinds, so check that the one you find covers the trade you are hiring.

Michigan at a glance
Who regulatesDepartment of Licensing and Regulatory Affairs (LARA), Bureau of Construction Codes
Statewide general contractor credentialYes. Residential Builder or Maintenance and Alteration Contractor license for work totaling $600 or more
Official lookupLARA Find or Verify a Licensed Professional or Business
Where to complainBureau of Construction Codes, Enforcement Section

A low threshold and two license types

Michigan's line is $600. LARA's page for homeowners states that all contractors offering to do work which totals $600 or more in labor and materials must be licensed by the department. At that figure almost any real job qualifies.

The license itself comes in two forms.

A Residential Builder license allows a contractor to build a complete residential structure and to do maintenance and alteration work, which is LARA's term for remodeling.

A Maintenance and Alteration Contractor license shows the holder has met requirements for one or more specific trades, and the trades are listed on the license. LARA names them:

  • basement waterproofing
  • carpentry
  • concrete
  • excavation
  • house wrecking
  • insulation
  • masonry
  • roofing
  • screen and storm sash
  • gutters
  • siding
  • swimming pools
  • tile and marble

A Maintenance and Alteration contractor licensed for siding is not licensed for roofing unless roofing is also printed there. Read the list on the record, not the logo on the truck.

Running the lookup

  1. Ask for the license number and the type. Builder, or Maintenance and Alteration with which trades.
  2. Search LARA's verification tool. Residential builder licensing moved to this Accela system in August 2019.
  3. Match the trades to your job. Then match the business name to the contract.

What LARA tells homeowners about money

The department's advice on paying is short and worth quoting: never pay for the entire job in advance. Make a deposit when work begins to cover materials and startup costs, pay by check to the company name, always get a receipt, and make scheduled payments as work progresses.

The Attorney General's consumer alert adds a contract warning. Watch for blank spaces and check boxes that could be altered later, including ones granting the contractor a lien on your home, and read any arbitration clause before you sign.

Complaints

If you cannot resolve a dispute, or believe you have been the victim of fraud or deceit, LARA directs you to the Bureau of Construction Codes, Residential Builders' Section. The bureau's Enforcement Section handles the complaint. Attach the contract, proof of what you paid and dated photos, so the investigator has something to work from.

Does a Michigan license cover electricians and plumbers?

The trades LARA lists for these two licenses do not include electrical, plumbing or mechanical work. Ask those tradespeople which license they hold and which office issued it, then verify it there.

The job is $500. Does the contractor need a license?

The requirement as LARA states it starts at work totaling $600 or more in labor and materials. A job under that figure falls below it.

Sources

Regulator pages last checked: November 2026. The regulator's own lookup is the authority; if this page and the regulator disagree, the regulator is right and we would like to hear about it.