before you hire a pro

License lookup by state

How to check a contractor license in Arizona

Short answer

Search the Arizona Registrar of Contractors' Contractor Search before you sign anything. The Registrar's own line is "Anyone can pretend to be a contractor. Check the license." Hiring a licensed residential contractor is also what makes you eligible for the Recovery Fund, which can pay up to $30,000 per homeowner.

Arizona at a glance
Who regulatesArizona Registrar of Contractors (ROC)
Statewide general contractor credentialYes. ROC license required to act as a contractor
Official lookupROC Contractor Search
Where to complainROC File a Complaint
Bond, insurance or fundLicense bond; Residential Contractors' Recovery Fund up to $30,000 per homeowner

To be a contractor in Arizona, the Registrar says, an entity must be licensed, and to be licensed it must possess a bond, among other requirements. The Contractor Search is the public record of who has done that.

The Registrar's advice before you hire is practical and specific:

  1. Get written estimates from at least three contractors. Each should spell out the project, the price, who obtains building permits and other terms.
  2. Sign only with a properly licensed contracting professional. Reconcile the written estimate with the written contract before signing, and make sure the costs match.
  3. Do not let payments get ahead of the work. The Registrar notes that special order materials, permits and fees may need to be paid for in advance. That is the exception, not a reason for a large general deposit.
  4. Keep records. Contracts, checks and correspondence are what a complaint or fund claim runs on.

"Licensed, bonded and insured" in Arizona

The Registrar has a blunt section on this phrase: just because the ad says it does not mean it is true. Many of the complaints it receives about unlicensed operators come from people who believed the advertisement.

There is a second surprise. With the exception of workers' compensation insurance, the ROC does not require an entity to possess insurance to be licensed. So an Arizona license proves a bond exists. It does not prove a liability policy exists. Ask for the certificate separately.

Bonds and the Recovery Fund

A residential contractor must post a cash deposit or surety bond of between $4,250 and $100,000 to obtain a license. On top of that, the contractor must either pay into the Residential Contractors' Recovery Fund or post a second bond of $200,000. The Registrar says the vast majority choose the fund.

The fund's terms, as the Registrar states them:

  • up to $30,000 per residential property owner to have work corrected or completed
  • each residential license is covered for up to $200,000 in total, shared pro rata among claimants
  • to be eligible, the contractor's residential or dual license must have been suspended or revoked as a direct result of a formal complaint you filed against the license (civil claims under a separate statute work differently)
  • suppliers, subcontractors and other commercial entities cannot claim

In other words the fund follows the complaint process. You file a formal complaint, the license is suspended or revoked because of it, and then the fund opens.

Warning

None of this exists if the contractor was unlicensed. An unlicensed operator has no ROC bond and no fund coverage, whatever the advertisement said.

Complaints

File with the Registrar through roc.az.gov/file-complaint. The ROC also runs an online customer portal for complaints and license applications.

Does the ROC require contractors to carry liability insurance?

No, according to the Registrar's consumer page. Workers' compensation aside, insurance is not a licensing requirement, so you have to ask the contractor for proof.

Can I claim from the Recovery Fund for a commercial property?

The fund is for residential property owners, and the Registrar says it does not accept claims from commercial entities.

Sources

Regulator pages last checked: November 2026. The regulator's own lookup is the authority; if this page and the regulator disagree, the regulator is right and we would like to hear about it.