before you hire a pro

Printable checklist

Before you sign a contract: checklist

Go through this with the contract in front of you and a pen in your hand. Every unticked box is a question to ask before you sign, not after.

Prints on plain paper with empty boxes to tick.

Who you are contracting with

  • The contractor's legal business name, street address and phone number are printed on the contract.
  • The license or registration number is on the contract, and I looked it up myself on the regulator's website today.
  • The name on the license record is the same as the name on the contract.
  • I have a certificate of insurance from the contractor's agent showing general liability and workers' compensation.
  • If a salesperson sold the job, their name is on the contract (Maryland also requires their license number).

What is being done

  • The scope lists each task, room by room, in enough detail that a stranger could tell what is included.
  • Materials are named by manufacturer, model, color and grade, with no bare "or equivalent".
  • Allowances are stated in dollars for anything not yet chosen.
  • Demolition, disposal, daily cleanup and final cleanup are included.
  • Every promise made in conversation appears in writing.
  • There are no blank spaces. Unused lines and boxes are crossed through.

Time

  • An approximate start date and completion date are stated.
  • The contract says what happens if the dates slip.

Money

  • The total price is stated, with any finance charges.
  • The deposit is within my state's limit (California: $1,000 or 10 percent, whichever is less; Maryland and Massachusetts: one-third; Pennsylvania: one-third on contracts over $5,000).
  • Later payments are tied to finished milestones, not calendar dates.
  • A final payment of meaningful size is held until completion, final inspection and lien waivers.
  • The contract requires a lien waiver from the contractor, subcontractors and suppliers with each payment.
  • Changes require a written, priced change order signed by both of us before the changed work starts.
  • I know whether any loan or financing is secured against my home.

Permits and rules

  • The contract says the contractor obtains the permits and whether the fee is included.
  • Required state notices are present (for example the homestead warning in Texas, or the escrow notice in New York).
  • The contract includes notice of my right to cancel within three business days where that applies.
  • I have read any arbitration clause and know who would conduct the arbitration.

Warranty and paperwork

  • The workmanship warranty is written down: what is covered, who stands behind it, and for how long.
  • Both of us sign and date, and I receive a complete signed copy before any work begins.
  • I have not paid anything before signing.

If a box will not tick

Ask for the missing item in writing. A contractor who does this for a living can supply any of it within a day. Reluctance over a license number, an insurance certificate or a written scope is useful to discover now, while walking away costs nothing.

Is it rude to bring a checklist to a contract signing?

No. Contractors who run their business properly see it as a sign of a client who will also pay on time and keep records.

Sources

Sources last checked: November 2026. Report an error.